Flooring

Stain foundation

Stained Slab

Having allowed the slab to dry/cure for 28 days Jim is able to stain and seal the first floor slab, before any walls are in place. We have chosen to stain, color brown, and seal the front and back porches as well. In the attached photo, the extreme contrast in appearance is cause by concrete sealer after the floors have been stained twice and washed thoroughly. The sealer will dry for 24 hours.
The lumber package and the framers arrive tomorrow. We are using Hardie Planks for the siding so the framers will be doing the siding as well.