Utilities

Inside job

Exterior ready for paint.

The exterior is deceptive because it appears to be a "finished house". Aw but not so. Now the detail work begins by running water, gas, sewer, heating and cooling plus all the electrical lines. Because we already have a garage and don't plan to build a new one for a while, the heating, cooling units, hot water heater and all other mechanical control points will be in a "mechanical room" on the second floor. I will take pictures as it develops. For today, the fireplace was installed. The water line has been trenched from our pump house (we have a well) and the plumbing lines are in.